EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
"Aluminaire"
-
Last 10 Modified Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (224)
Finances
- (4)
Research
- (1)
Media
- (5)
CAD
- (3)
Tooling
- (1)
Prototype
- (1)
Flying Pics
- (2)
Workshop
- (4)
Tools
Fuselage
Firewall
Tail Feathers
- (47)
Wings
- (125)
Controls
Landing Gear
- (1)
Lighting
- (19)
Instrument Panel
- (3)
Avionics
- (2)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
W&B
- (1)
Kit
- (2)
AirVenture
- (1)
EAA Speaker
- (1)
Young Eagles
Builder Name:
Glenn Gordon
-
Project:
Timber Tiger - ST-L Clipped-wing
-
VIEW REPORTS
Total Hours:
646.9
Start/Last Date:
Jun 01, 2022 - No Finish Date
Engine:
Rotax 912ULS with big bore cylinder upgrade
Propeller:
Sensenich Ground Adjustable
Panel:
VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
Friendly URL:
https://eaabuilderslog.org?s="Aluminaire"
Home or Last Project Picture
May 26, 2024
Aileron fiberglass reinforcing tape and rib stitching complete.
- (8 hours)
Category: Wings
Aileron fiberglass reinforcing tape and rib stitching completed.
20240527_200718.jpg
20240527_200734.jpg
May 27, 2024
Tail feather gap fairing fitting and bonding.
- (4 hours)
Category: Tail Feathers
Tail feather gap fairing fitting and bondin
20240527_191455.jpg
20240527_191511.jpg
May 25, 2024
Wing stub and aileron bay sidewall covering.
- (4 hours)
Category: Wings
Wing stub and aileron bay sidewall covering.
20240525_150413.jpg
20240525_150419.jpg
20240525_150423.jpg
May 22, 2024
Aileron stich layout.
- (2 hours)
Category: Wings
Aileron stich layout.
20240522_205933.jpg
May 19, 2024
Aileron pushrod clearance tool fab and centering check.
- (5 hours)
Category: Wings
Aileron pushrod clearance tool fab and centering check.
20240519_102438.jpg
20240519_102442.jpg
20240519_102507.jpg
20240519_102518.jpg
20240519_113731.jpg
20240519_113739.jpg
20240519_113745.jpg
20240519_113750.jpg
20240519_121611.jpg
20240519_132731.jpg
May 18, 2024
Aileron Bellcrank centering spacer fabrication and install.
- (3 hours)
Category: Wings
Aileron Bellcrank centering spacer fabrication and install.
20240518_093220.jpg
20240518_124327.jpg
20240518_124351.jpg
20240519_092355.jpg
May 25, 2024
Learning the Staggerwing Knot.
- (2 hours)
Category: Tail Feathers
Learning the Staggerwing Knot.
20240508_220352.jpg
May 25, 2024
Rib Stitching the elevator.
- (3 hours)
Category: Tail Feathers
Rib Stitching the elevator.
20240511_122301.jpg
May 25, 2024
1st stitching complete!
- (2 hours)
Category: Tail Feathers
1st stitching complete!
20240513_202059.jpg
May 09, 2024
Aileron fabric bridging workdown.
Category: Wings
Aileron fabric bridging workdown.
20240509_164804.jpg
20240509_164843.jpg
20240509_165916.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.